{"id":68197,"date":"2022-08-31T18:26:00","date_gmt":"2022-08-31T12:56:00","guid":{"rendered":"https:\/\/dwarkaparichay.com\/blog\/?p=68197"},"modified":"2022-09-03T15:28:14","modified_gmt":"2022-09-03T09:58:14","slug":"consulting-engineers-writes-to-nitin-gadkari-to-include-value-engineering-as-part-of-the-morths-epc-contract","status":"publish","type":"post","link":"https:\/\/dwarkaparichay.com\/blog\/consulting-engineers-writes-to-nitin-gadkari-to-include-value-engineering-as-part-of-the-morths-epc-contract\/","title":{"rendered":"CONSULTING ENGINEERS WRITES TO NITIN GADKARI TO INCLUDE VALUE ENGINEERING AS PART OF THE MoRTH\u2019s EPC CONTRACT"},"content":{"rendered":"\n<p>Infrastructure and consulting Engineers in a letter written &nbsp;to Mr Nitin Gadkari, Union Minister for Road Transport And Highway (MoRTH) has urged him to include \u2018Value engineering&nbsp; as part of the Engineering, Procurement and Construction (EPC) Contract document for faster adoption cost saving newer technologies and speed &nbsp;finishing of the project.<\/p>\n\n\n\n<p>\u201c In the present MoRTH\u2019s &nbsp;EPC contract document which is broadly based on International Federation of Consulting Engineers (FIDIC) document the &nbsp;Article 13 related to Variation\/Change of Scope, the term \u2018value engineering\u2019 is missing from the MORTH EPC document. This dilutes the concept of value engineering restricting it to a pre-determined cost, and stifles use of new-technology which can result in substantial and justifiable value addition.\u201d Said Mr K K Kapila, FIDIC ambassador for Asia Pacific Region and Chairman, Business and Policy Committee, Consulting Engineers Association of India (CEAI) .<\/p>\n\n\n\n<p>\u201c The includion of Value engineering the EPC contract will help in adoption of cost effective technologies and better engineering.&nbsp; This value can be in terms of speed of construction which in turn results in quicker availability of a road or bridge for commercial utilisation.&nbsp; There is also significant value in lower maintenance costs in the long run and the savings on raw materials which is a critical national resource. Most important is the relief to locals and early resumption of commercial activity due to reduced road and rail blocks.&nbsp; This situation is very critical wherein bridges are involved and decision is delayed. Mature decision making towards better value engineering needs this mind-set to be addressed at all levels with clear directions.\u201d Said Mr Kapila.<\/p>\n\n\n\n<p>\u201cA first step could be to incorporate \u2018value engineering\u2019 in letter and spirit in the MORTH EPC document, as spelt out in the FIDIC concept and issue guidelines on what will constitute earned value, encouraging time saving methods and new-technology. It is my sincere observation as a FIDIC Ambassador looking at Infrastructure development in our country as the highest priority.\u201d He added.<\/p>\n\n\n\n<p>\u201cThe best example of this aspect \u00a0stood out prominently when new-technology modular bridges for speedier construction were recommended \u00a0on requests from both NHAI &amp; NHIDCL.\u00a0 The preference was for a lower cost obsolete Bailey bridge.\u00a0 This results in weak and unsafe bridges that reduce the capacity of the NHs to 25% for long periods, and increases transportation costs. The need is for 3<sup>rd<\/sup>\u00a0generation Quick lay modular bridges especially \u00a0in the disaster prone Hill states \u201c.he added .<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Infrastructure and consulting Engineers in a letter written &nbsp;to Mr Nitin Gadkari, Union Minister for Road Transport And Highway (MoRTH) has urged him to include \u2018Value engineering&nbsp; as part of the Engineering, Procurement and Construction (EPC) Contract document for faster adoption cost saving newer technologies and speed &nbsp;finishing of the project. \u201c In the present MoRTH\u2019s &nbsp;EPC contract document which is broadly based on International Federation of Consulting Engineers (FIDIC) document the &nbsp;Article 13 related to Variation\/Change of Scope, the term \u2018value engineering\u2019 is missing from the MORTH EPC document. This dilutes the concept of value engineering restricting it to <\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1875],"tags":[],"class_list":["post-68197","post","type-post","status-publish","format-standard","hentry","category-events"],"_links":{"self":[{"href":"https:\/\/dwarkaparichay.com\/blog\/wp-json\/wp\/v2\/posts\/68197","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dwarkaparichay.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dwarkaparichay.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dwarkaparichay.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dwarkaparichay.com\/blog\/wp-json\/wp\/v2\/comments?post=68197"}],"version-history":[{"count":1,"href":"https:\/\/dwarkaparichay.com\/blog\/wp-json\/wp\/v2\/posts\/68197\/revisions"}],"predecessor-version":[{"id":68198,"href":"https:\/\/dwarkaparichay.com\/blog\/wp-json\/wp\/v2\/posts\/68197\/revisions\/68198"}],"wp:attachment":[{"href":"https:\/\/dwarkaparichay.com\/blog\/wp-json\/wp\/v2\/media?parent=68197"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dwarkaparichay.com\/blog\/wp-json\/wp\/v2\/categories?post=68197"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dwarkaparichay.com\/blog\/wp-json\/wp\/v2\/tags?post=68197"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}